Customization: | Available |
---|---|
After-sales Service: | 24 Hours Online Service |
Warranty: | 1years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
DAF machine for wastewater treatment
Brief introduction of DAF machine
No. | Item | Qty | Remark |
1 | Maxi External dimension | 1 | 4.6*1.5*2.0 |
2 | Dissolved air system | 1 | Dissolved air tank,dissolved air pump, pipeline,valve,instrument,switch etc. |
3 | Discharge slagging system | 1 | Scraper plate,motor,reducer,chain,gear etc. |
4 | Cleaning water system | 1 | Carbon steel antiseptic, clean water chamber room,pipeline,flange etc. |
5 | Releaser | 1 | Carbon steel antiseptic |
6 | Electric control carbinet | 1 | CHNT |
7 | Flocculant dosing system | 2 | PE tank,metering pump |
Model | Capacity | Machine size | Dissolving air tank volume (mm) |
Motor power | Machine weight |
(L*W*H) | |||||
(m3/h) | (m) | (kw) | (kg) | ||
YMRF-1 | 1 | 1.0*0.8*1.0 | Φ200 h800 | 1.5 | 300 |
YMRF-2 | 2 | 1.8*1.0*1.5 | Φ200 h800 | 1.5 | 500 |
YMRF-3 | 3 | 2.0*1.5*1.5 | Φ300 h1000 | 2.2 | 800 |
YMRF-5 | 5 | 2.5*1.5*2.0 | Φ300 h1500 | 2.2 | 1500 |
YMRF-10 | 10 | 4.6*1.5*2.0 | Φ400 h3000 | 4 | 2100 |
YMRF-20 | 20 | 5.8*2.0*2.0 | Φ400 h3000 | 4 | 5400 |
YMRF-30 | 30 | 7.2*2.2*2.1 | Φ500 h3000 | 5.5 | 6300 |
YMRF-40 | 40 | 8.3*2.2*2.1 | Φ500 h3000 | 5.5 | 7500 |
YMRF-50 | 50 | 9.0*2.2*2.5 | Φ600 h3000 | 7.5 | 9100 |
YMRF-60 | 60 | 10.0*2.2*2.5 | Φ600 h3000 | 7.5 | 10000 |
YMRF-80 | 80 | 10.8*2.2*2.5 | Φ800 h3000 | 11 | 11000 |
YMRF-100 | 100 | 11.8*2.2*2.5 | Φ800 h3000 | 15 | 11500 |
Grouped equipment for DAF machine
1. Chemical dosing system : add PAC PAM liquid to wastewater.
2. Pipeline flocculator : Make sure PAM PAC liquid with wastewater mixed enoughly
Feature:
1).Dissolved air pump edge bibulous the edge is inspiratory, pump pressurized mix within, gas to liquid efficient dissolving, small bubbles than 30 um.
2).Low voltage operation, the dissolved gas efficiency is as high as 99%, release rate as high as 99%.
3).Tiny bubbles and suspended particles of efficient adsorption, improve the SS remove effect.
4).Dissolved gas water dissolving efficiency 80-100%, than traditional dissolved gas floating high efficiency three times.
5).Pressure-capacity curve smooth, easy to achieve automatic control, easy to operate, easy maintenance, low noise.
6).Large treatment capacity,high efficiency,occupies less.
7).Technology process and equipment sample,easy to use and maintain.
8).Can eliminate sludge bulking.
9).When working,the aerator will send air to the water,can remove the surfactant and odour effectively.At the same time,aeration can add the dissolved air quantity in the water,which will provide advantages to follow-up units.
10).For low temperature,low UTN,algae-containing water,air flotation technology will be the best choose.
Industrial Applications
Poultry processing, Meat processing ,Laundries and textiles ,Egg processing ,Byproduct rendering, Pulp and paper, Plastics recycling, Dairy and milk products, Metal plating and finishing, Bakeries ,Confectionaries, Food processing, Snack food processing, Beverage, Petroleum and petrochemical refining ,Natural gas and petroleum fracking ,Biochemical ,Personal care products
Municipal Applications :
Waste activated sludge thickening, Biological solids clarification ,Phosphorous removal, Algae removal.
Contacts
Attn : Bruce
Web : Http://qdyimei.en.made-in-china.com
Address : No.386 Yishan road, Huangdao district, Qingdao
Company Information
Qingdao Yimei environment project Ltd. Found in 1988,located in maxi Chinese affairs harbour base Jiao Nan City.Occupy about 36,000 square metres, 15,000 square metres workshop building, have each kind of processing machine about 130 pcs, as one of Shandong Province environment protection industrial association trustee member unit, now have staff about 300 person, 72 engineers and technicians, mainly engaged in the environment project, environmental protection equipment design and manufacture, water treatment technological development, engnieering construction, technical service and series of products of client customized.
We have the well experienced engineer, strong specialized production base, advanced manufacturing facilities, and can supply the first-rate product and special field consulting service.
In the long rang concentrates efforts on environment protection cause investing in construction, complete sets of equipment and project overall contracting.
Certifications
FAQ
1. How to buy your idea products? A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
2. How to pay? A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
4. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5. How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
6. How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
7. How to install after the equipments arriving destination? A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.