Secured Trading Service

Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant

Qingdao Yimei Environment Project Co., Ltd.
  • Audited Supplier
  • 9 yrs
  • leading factory

Contact Supplier

Product Highlights

  • Customizable Design: Color, voltage, and product name can be customized to meet specific client requirements.
  • Advanced MBR Technology: Combines MBR bio-reaction with aerobic tanks for efficient organic matter decomposition and clean water output.
  • Versatile Application: Suitable for industrial, home, agricultural, and hospital sewage treatment, including upgrades and new installations.
  • Professional Engineering: Backed by 72 engineers and technicians with over 30 years of experience in environmental projects.
  • Comprehensive After-Sales: Provides 24-hour online service, overseas installation guidance, and lifelong technical support.
  • High-Quality Materials: Constructed from carbon steel or stainless steel with automatic welding and triple paint treatment.
  • Efficient Sludge Management: Features automatic sludge discharge via static pressure and dedicated collection hoppers.
  • Certified Quality: Manufactured under ISO9001 and CE certification standards ensuring reliability and safety.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant

Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant pictures & photos
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant pictures & photos
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant pictures & photos
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant pictures & photos
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant pictures & photos
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant pictures & photos
Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
  • Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
  • Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
    Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
  • Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
    Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
  • Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
    Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
  • Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
    Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
  • Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
    Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
  • Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
    Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant

Find Similar Products

Product Description

Compact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance PlantCompact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance PlantCompact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance PlantCompact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance PlantCompact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance PlantCompact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance PlantCompact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance PlantCompact Sewage Treatment Plant Using Mbbr Mbr Systems High-Performance Plant
1.Screen channel
Install Manual screen or mechanical bar screen in the screen channel,they can remove large particles in the waste water,such as plastic bag,Pericarp,Remnant,etc.
2.Equilization tank
This tank is used to adjust the wastewater quantity and quality in different time,make sure the inffluent water have the same quality,which will better for the following treatment.
3.Anoxic tank
The anoxia tank use anaerobic bacteria to hydrolysis, acidate and methanated the COD and BOD. Remove organic matter in waste water, and improve the biodegradability of sewage, is conducive to the subsequent aerobic treatment.
4.MBR bio-reaction tank
MBR bio-reaction tank and aerobic tank can be combined together.The role of aerobic tank is to make activated sludge to take on aerobic respiration,further decomposition of organic matter into inorganic matter.MBR bio-reaction tank trap activated sludge and other matters,clean water will be suck out by sucking pump.
5.Sludge tank
there are set sludge collecting hopper and sludge pipeline in sludge tank bottom, in order to convenient for sludge concentration, set weir water tank in top, there open mud discharge inlet in bottom, rely on static pressure automatic discharge mud.
 
Function and application scope:
 
Function:
1).Already existing sewage treatment plant,running water factory upgrade,reform 
2).Municipal sewage treatment plant,running water factory new instruction
3).pure water production pretreatment 
4).Reuse of reclaimed water

 
Application scope:
1).Hotel,restaurant,community etc domestic sewage treatment recycle
2).Industrial and mining enterprises,remote village,sentry ,tourist area etc domestic sewage recycle. 
3).Each kind of industrial sewage (similar to domestic sewage) :such as hospital sewage,pharmaceuti





Qingdao Yimei environment project Ltd. Found in 1988, located in maxi Chinese affairs harbour base Jiao Nan City. Occupy about 36,000 square meters, 15,000 square meters workshop building, have each kind of processing machine about 130 pcs, as one of Shandong Province environment protection industrial association trustee member unit, now have staff about 300 person, 72 engineers and technicians, mainly engaged in the environment project, environmental protection equipment design and manufacture, water treatment technological development, engineering construction, technical service and series of products of client customized.
    We have the well experienced engineer, strong specialized production base, advanced manufacturing facilities, and can supply the first-rate product and special field consulting service.
In the long rang concentrates efforts on environment protection cause investing in construction, complete sets of equipment and project overall contracting.
  1. Professional design for you 
    According to the actual needs of professionals will be free to design targeted programs and products to ensure efficient complete solution actual demand.
  2. Strict product examination
    Professional advanced processing equipment and skilled workers, to build an advanced DAF equipment.
  3. Professional after sale service
    For equipment installation, specialized personnel will provide overseas equipment installation guide, commissioning, operation, maintenance instructions.
  4. Technical support
    In the process of use, if you encounter any problems, we will always provide technical support for you.


 

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR255057". Items marked "verified" are certified.

Watch Video
Watch Video
Qingdao Yimei Environment Project Co., Ltd.
Qingdao Yimei Environment Project Co., Ltd.
Qingdao Yimei Environment Project Co., Ltd.
Qingdao Yimei Environment Project Co., Ltd.
Qingdao Yimei Environment Project Co., Ltd.
Qingdao Yimei Environment Project Co., Ltd.
Qingdao Yimei Environment Project Co., Ltd.
Qingdao Yimei Environment Project Co., Ltd.

About Our Factory & Business Background

Address
No. 887 Feiyu Road, Huangdao District, , Qingdao, Shandong, China
Terms of Payment
LC, T/T, D/P
International Commercial Terms(Incoterms)
FOB, EXW, FCA
Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Nearest Port
qingdao port

Our Production Capability & Technical Expertise

Main Products
Sewage Treatment Plant, Dissolved Air Floating Machine, Inclined Plate Clarifier, Containerized Sewage Treatment Plant, Package Wastewater Treatment Plant, Effluent Treatment Plant, Sludge Screw Dehydrator, Mechanical Bar Screen, Rotary Drum Filter, Chemical Dosing Equipment

Our Industry Experience & Global Business Record

Export Year
2019-02-20
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is the warranty period for this plant?
The product comes with a 1-year warranty.
Can the color and voltage be customized?
Yes, both the color and voltage can be customized according to your request.
What types of sewage can this plant treat?
It is suitable for industrial, home, agricultural, and hospital sewage, as well as reclaimed water reuse.
Does the supplier provide overseas installation services?
Yes, specialized personnel provide overseas equipment installation guidance, commissioning, and operation instructions.
What is the lead time for production?
The lead time is 1-3 months during peak season and one month during the off-season.
What payment terms are accepted?
We accept LC, T/T, and D/P as terms of payment.
What control system is used in the plant?
The plant uses a Siemens PLC Auto Control system for efficient operation.
What is the main material used for construction?
The main materials are carbon steel or stainless steel, with automatic welding and triple paint treatment.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now