1.Screen channel Install Manual screen or mechanical bar screen in the screen channel,they can remove large particles in the waste water,such as plastic bag,Pericarp,Remnant,etc. 2.Equilization tank This tank is used to adjust the wastewater quantity and quality in different time,make sure the inffluent water have the same quality,which will better for the following treatment. 3.Anoxic tank The anoxia tank use anaerobic bacteria to hydrolysis, acidate and methanated the COD and BOD. Remove organic matter in waste water, and improve the biodegradability of sewage, is conducive to the subsequent aerobic treatment. 4.MBR bio-reaction tank MBR bio-reaction tank and aerobic tank can be combined together.The role of aerobic tank is to make activated sludge to take on aerobic respiration,further decomposition of organic matter into inorganic matter.MBR bio-reaction tank trap activated sludge and other matters,clean water will be suck out by sucking pump. 5.Sludge tank there are set sludge collecting hopper and sludge pipeline in sludge tank bottom, in order to convenient for sludge concentration, set weir water tank in top, there open mud discharge inlet in bottom, rely on static pressure automatic discharge mud. Function and application scope: Function: 1).Already existing sewage treatment plant,running water factory upgrade,reform
2).Municipal sewage treatment plant,running water factory new instruction
3).pure water production pretreatment
4).Reuse of reclaimed water Application scope: 1).Hotel,restaurant,community etc domestic sewage treatment recycle
2).Industrial and mining enterprises,remote village,sentry ,tourist area etc domestic sewage recycle.
3).Each kind of industrial sewage (similar to domestic sewage) :such as hospital sewage,pharmaceuti
Qingdao Yimei environment project Ltd. Found in 1988, located in maxi Chinese affairs harbour base Jiao Nan City. Occupy about 36,000 square meters, 15,000 square meters workshop building, have each kind of processing machine about 130 pcs, as one of Shandong Province environment protection industrial association trustee member unit, now have staff about 300 person, 72 engineers and technicians, mainly engaged in the environment project, environmental protection equipment design and manufacture, water treatment technological development, engineering construction, technical service and series of products of client customized. We have the well experienced engineer, strong specialized production base, advanced manufacturing facilities, and can supply the first-rate product and special field consulting service. In the long rang concentrates efforts on environment protection cause investing in construction, complete sets of equipment and project overall contracting.
Professional design for you According to the actual needs of professionals will be free to design targeted programs and products to ensure efficient complete solution actual demand.
Strict product examination Professional advanced processing equipment and skilled workers, to build an advanced DAF equipment.
Professional after sale service For equipment installation, specialized personnel will provide overseas equipment installation guide, commissioning, operation, maintenance instructions.
Technical support In the process of use, if you encounter any problems, we will always provide technical support for you.