Advanced Aerobic Sludge Treatment System for Wastewater Management
Contact Supplier
Product Highlights
- Customizable Capacity: Capacity ranges from 1 to 30 m3/h, tailored to specific project needs.
- Advanced A/O Process: Utilizes anoxic and aerobic tanks for efficient organic matter degradation and denitrification.
- Underground Installation: Equipment can be buried underground, saving surface space and blending with environment.
- High-Quality Materials: Constructed with fiber glass and steel, treated with anti-corrosion paint like SigmaCoatings.
- Comprehensive Treatment: Removes COD, BOD, SS, sulfides, and chroma to meet national discharge standards.
- Professional Design: Free targeted design based on water source, quality, flow rate, and ground area.
- Technical Support: Overseas installation guidance, commissioning, and ongoing technical support provided.
- ISO9001 Certified: Manufacturing process adheres to ISO9001 standards for quality assurance.
Product Attributes
- Customization
- Available
- After-sales Service
- 1 Month
- Warranty
- 1 Year
- Model NO.
- YMSZ
- Method
- Biological Treatment
- Usage
- Industrial
- Name
- a/O Packaged Sewage Treatment Plant
- Application
- BOD/Cod > 0.3
- Delivery Time
- 15 Days After Receving The Deposit
- Certification
- ISO9001
- Color
- as Requested
- Capacity
- Customized
- Transport Package
- Standard Export Packing
- Specification
- Customized
- Trademark
- YIMEI
- Origin
- China
- HS Code
- 8421219990
- Production Capacity
- 1000 Sets Per Year
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of Advanced Aerobic Sludge Treatment System for Wastewater Management
Find Similar Products
Product Description
A/O sewage treatment system
With the increase of the economy and population, the human beings have paid more attention on the pollution of nature. On the basis of summarizing the operation of the sewage device and combined with our scientific research achievement and the artificial practice of our company, a set of treatment device for organic waste water has been designed and it has the sewage treatment device adopted the domestic advanced process and production manufacturing technology at the late period of 90s with the fiber glass and steel as the main materials.
The purpose is to make the domestic sewage and industrial waste water reach the requirements of the user discharge or recycle by means of the equipment. The equipment is mainly applied to the residence community (including the villa community), senior hotel, hospital, comprehensive office building, dye house, chemical plant and other small-scale manufacturer and organization for waste water treatment.
The water quality of the influent from the equipment is able to reach the Sewage Comprehensive Discharge Standard regulated by the nation and all sets of the equipment can be buried underground, therefore, it is called "buried sewage treatment complete equipment".
Settling main use to make sludge and water separation, further degrade organic matter in settling, then discharge directly after sludge and water separation, part of sewage backflow into aeration tank, another parts of surplus sludge discharge.
The effluent first enter into grid tank, it equip with bar screen in the grid tank, which can remove bigger suspended matter, seston and ribbon in effluent, then flow into djusting tank, its main function is equalized water quality(COD,temperature,PH) and water volume, to avoid impact loading influence biological treatment, then the effluent enter flow into the integrated sewage treatment plant by lifting pump.
The sewage treatment plant main contain air flotation tank (dissolving tank), anxoic tank (biochemical tank), Oxidation tank (second biochemical tank), settling tank (second sedimentation tank), etc several parts. The main function of air flotation tank is remove flocculated suspended matter. In anoxia tank, which can improve sewage biodegradability, create conditions for further treatment, inside the anoxia tank, produce large number of anoxic bacteria, the intercept down organic matter broke chain or open loop, decompose into Simple low molecular organic which can be easy to absorb utilize by aerobic bacterium, effectively improve the subsequent aerobic phase of the treatment efficiency.
The sewage still contain some organic matter and higher content ammonia nitrogen. in order to make the organic matter further oxygenolysis, at the same time, carbonation tend to be completely, nitrification can proceeding smoothly, so set contact oxidation tank, its rely on autotrophic type bacteria finish treatment, they adopt Organic decomposition producing inorganic carbon source or carbon dioxide in air as nutritional sources, make the ammonia nitrogen in sewage convert into.
In oxidation tank equip with padding, the whole Biochemical process rely on many microbes attached on the padding.
Effluent water after separated will enter into disinfecting tank proceeding solid liquid separation, some effluent water from contact oxidation tank back flow into equalize tank proceeding internal Circulation, so achieve denitrification purpose, another parts will flow into secondary settling tank, make further solidliquid separation, the effluent water after separated will enter into cleaning water tank, then reuse in irrigation.
Main treatment unit
(1) Flocculant air flotation
Waste water is alkality, it contain sulfur compound, the common flocculant is PAC, flocculant aid is PAM, but too much PAC will influence follow up biological treatment, so such project will chose FM composite flocculant.
(2) Anoxic tank
In anoxic condition, organic in waste water finished the first section of anoxic reaction , which make the difficult biodegradable organic matter resolve into easy biodegradable small molecular organic matter, reduce CODcr, BOD5, SS, S2-, chroma, improve sewage biodegradability, create better condition for follow-up biological treatment.
(3) Biological treatment
Biological oxidation is the new biomembrane process, which produce bigger activated sludge content, to improve volume loading of contact oxidation tank, improve pollutant remove efficiency, at the same time, with the feature of small occupy, convenient maintenance, which has widely used in chemical industrial, food, pharmacy, printing etc industrial sewage treatment, with obvious effective.
Technical parameter
| Item | YMSZ-1 | YMSZ-3 | YMSZ-5 | YMSZ-7.5 | YMSZ-10 | YMSZ-15 | YMSZ-20 | YMSZ-30 | |
| capacity(m3/h) | 1 | 3 | 5 | 7.5 | 10 | 15 | 20 | 30 | |
| equipment Nm | 1 | 1 | 1 | 1 | 2 | 2 | 2 | 3 | |
| Primary settling tank | 1.8 | 5.5 | 9 | 14 | 18 | 27 | 36 | 50 | |
| Contact oxidation tank (m3) | 5.0 | 14.5 | 24 | 36 | 44 | 63 | 83 | 130 | |
| Secondary settling tank surface load (m3/m2h) |
1.2 | 1.3 | 1.3 | 1.3 | 1.2 | 1.2 | 1.5 | 1.5 | |
| Disinfection tank (m3) | 0.6 | 1.8 | 2.8 | 4 | 5.5 | 8 | 10 | 15 | |
| Air blower | model | HC-25IS | HC-30IS | HC-50C | HC-50IS | HC-60IS | HC-80S | HC-100S | HC1-100S |
| power(kw) | 0.4 | 0.75 | 1.5 | 2.2 | 2.2 | 3.7 | 5.5 | ||
| units | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | |
| sewage pump | model | AS10-2CB | AS16-2CB | ||||||
| power(kw) | 1.0 | 1.6 | |||||||
| Total Weight(t) | 5.5 | 6.5 | 8 | 11 | 17 | 20 | 21 | 29 | |
| Occupy area(m2) | 6 | 14 | 20 | 30 | 50 | 65 | 75 | 115 | |
Advantages
Wastewater treatment process features
(1) Chemical reaction settling, its main purpose is remove part of organic, substantially reduce sulfide,chroma and SS, improve B/C ratio, proper reduce PH, create condition for biological treatment.
(2)Hydrolysis acidify tank adopt padding form, timing aeration and washing biomembrane to prevent sediment, each 4 hours start 10 minutes, to keep the tank in anoxic condition, it can reach exchange membrane purpose.
(3)A/O system adopt contact oxygen manner, it can reduce structures, save investment, impact resistance, small sludge, its mainly used to remove grate part of dissolved organic matter and denitrification.
(4)Settling tank : in order to make the effluent water SS meet up discharge standard, adopting vertical settling tank to make solid liquid separation, 1 set , surface load 1.0m3/m2·hr.
Our Services
1.Professional design for you
According to the actual needs of professionals will be free to design targeted programs and products to ensure efficient complete solution actual demand.
2.Strict product examination
Professional advanced processing equipment and skilled workers, to build an advanced DAF equipment.
3.Professional after sale service
For equipment installation, specialized personnel will provide overseas equipment installation guide, commissioning, operation, maintenance instructions.
4.Technical support
In the process of use, if you encounter any problems, we will always provide technical support for you.
Company Information
Qingdao Yimei environment project Ltd. Found in 1988,located in maxi Chinese affairs harbour base Jiao Nan City.Occupy about 36,000 square metres, 15,000 square metres workshop building, have each kind of processing machine about 130 pcs, as one of Shandong Province environment protection industrial association trustee member unit, now have staff about 300 person, 72 engineers and technicians, mainly engaged in the environment project, environmental protection equipment design and manufacture, water treatment technological development, engnieering construction, technical service and series of products of client customized.
We have the well experienced engineer, strong specialized production base, advanced manufacturing facilities, and can supply the first-rate product and special field consulting service.
In the long rang concentrates efforts on environment protection cause investing in construction, complete sets of equipment and project overall contracting.
Certifications




FAQ
1. How to buy your idea products? A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
2. How to pay? A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
4. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5. How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
6. How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
7. How to install after the equipments arriving destination? A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR255057". Items marked "" are certified.
Company Profile
Qingdao Yimei Environment Project Co., Ltd. Was set up in 1988. Our company is located in Jiaonan City. We have a production area of 15, 000 square meters and a workshop building area of 36, 000 square meters.
We have more than 130 kinds of treating machinery. We are a member of Shandong Province Environmental Protection Industrial Association. Now we have 100 staff members and workers, including 20 engineers and technicians. We are engaged in environmental protection equipment design and fabrication, water treatment technological development, engineering construction, technical service and others.
Our company has experienced engineers, specialized big and powerful production base and advanced fabrication equipment. We have won a good reputation among customers with good quality, competitive prices and advanced techniques since our establishment. We concentrate our efforts on environmental protection cause.
Our waste water treatment plant have export to many countries, such as America, Australia, Mexico, Russia, Saudi Arabia, Peru, Columbia, Vietnam, Thailand, Philippines, Malaysia, Indonesia, Nigeria, India Chad, Kenya, Iraq, Sudan etc; In order to supply good after-sale service, We have build our branch company in America, Malaysia, Australia, Philippines etc, client can easily to get the spare parts, our oversea install operating team have more than 10 year experience, if you have any problem in waste water industry, pls come for us, we can supply to you the best solution with the most reliable technique.
Our company always insist on our motto of "strive for survival on the basis of equality with the customers developing together". We stick to our spirit of "going all out, being innovative, harmonious, offering as a tribute". We are looking forward to establishing relationships with you in the near future.
About Our Factory & Business Background
- Address
- No. 887 Feiyu Road, Huangdao District, , Qingdao, Shandong, China
- Terms of Payment
- LC, T/T, D/P
- International Commercial Terms(Incoterms)
- FOB, EXW, FCA
- Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month - Nearest Port
- qingdao port
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2019-02-20
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- How to buy your idea products?
- You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
- How to pay?
- TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
- What is the delivery time?
- It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
- How to pack the products?
- We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
- How to keep your equipments from corrosion?
- We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
- How do you manufacture your equipment ?
- Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
- How to install after the equipments arriving destination?
- We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
Send your message to this supplier
People who viewed this also viewed
-
US$1,500.00-7,000.00 / Piece
-
US$9,000.00-29,800.00 / set
-
US$4,800.00-9,800.00 / Piece
-
US$5,800.00-10,000.00 / Piece
-
US$3,000.00-9,000.00 / Piece
-
US$4,800.00-9,800.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Hot sales
- Advanced Aerobic Sludge Treatment System for Wastewater Management
Related Categories
Hot Searches
- Cooling System Factories
- Industrial System Factories
- Air System
- Sewage Pump Factories
- Efficient Water Treatment System
- Sewage System
- Waste Water Treatment System
- Sewage Treatment System
- Sewage Treatment Chemical
- Advanced Sewage Treatment System Bulkbuy