Customization: | Available |
---|---|
After-sales Service: | 24 Hours Online Service |
Warranty: | 1years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
MBR is a kind of brand new sewage treatment technics which combine Superfine filter components and bioreactor. Membrane separation plant hold back the activated sludge and macromolecule in biochemical reaction basin, omit secondary settling pond. the sludge depth greatly improved, HRT and SRT can separately control, the nonbiodegradable material constant reaction ,degradation in reactor. Membrane bio-reactor system greatly intensify the bioreactor function by membrane separation.
The sewage enter into equalize tank pass by 1-3mm bar screen, used to equalize water quality and volume. The intercept impurity need clear up in regular. Next, the sewage in equalize tank will pump to MBR system, in MBR system realize mirco-organism resolve reduction ,which contain aerobic and anoxia reaction area, the can't degrade impurity and activated sludge will intercept in the membrane tank , the membrane filtering output water will reach standard reuse or discharge.
The sewage first pass by bar screen (mechanical bar screen or manual bar screen), bar space is 3mm, used to gain big particle suspended solid and impurity, then flow into equalize tank interior, to make the water quality,volume in equalize tank, then lift the sewage into anoxia tank by sewage lift pump, after hydrolytic acidify by anoxia tank, enter into MBR biochemical treatment system. Whole set of bio-chemical treatment system is composed of front pretreatment and reaction tank, according to influent water quality and effluent water quality requirements, which decide if need and design leading treatment end. In reaction tank equipment immersed plain film, constitute MBR- aerobic running mode.
MBR reaction tank effluent water direct enter into PE recycle tank, discharge or pump into reclaimed water pipe network to recycle.
Function and application scope:
Function:
1).Already existing sewage treatment plant,running water factory upgrade,reform
2).Municipal sewage treatment plant,running water factory new instruction
3).pure water production pretreatment
4).Reuse of reclaimed water
Application scope:
1).Hotel,restaurant,community etc domestic sewage treatment recycle
2).Industrial and mining enterprises,remote village,sentry ,tourist area etc domestic sewage recycle.
3).Each kind of industrial sewage (similar to domestic sewage) :such as hospital sewage,pharmaceutical sewage ,washing sewage,food sewage etc.
Certifications
1.Professional design for you
According to the actual needs of professionals will be free to design targeted programs and products to ensure efficient complete solution actual demand.
2.Strict product examination
Professional advanced processing equipment and skilled workers, to build an advanced DAF equipment.
3.Professional after sale service
For equipment installation, specialized personnel will provide overseas equipment installation guide, commissioning, operation, maintenance instructions.
Company information
Qingdao Yimei environment project Ltd. Found in 1988,located in maxi Chinese affairs harbour base Jiao Nan City.Occupy about 36,000 square metres, 15,000 square metres workshop building, have each kind of processing machine about 130 pcs, as one of Shandong Province environment protection industrial association trustee member unit, now have staff about 300 person, 72 engineers and technicians, mainly engaged in the environment project, environmental protection equipment design and manufacture, water treatment technological development, engnieering construction, technical service and series of products of client customized.
We have the well experienced engineer, strong specialized production base, advanced manufacturing facilities, and can supply the first-rate product and special field consulting service.
In the long rang concentrates efforts on environment protection cause investing in construction, complete sets of equipment and project overall contracting.
FAQ
1. How to buy your idea products? A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
2. How to pay? A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
3. What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
4. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5. How to keep your equipments from corrosion?
A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
6. How do you manufacture your equipment ?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
7. How to install after the equipments arriving destination? A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.