Dissolved Air Flotation Machine for Grease Trap Waste

Product Details
Customization: Available
After-sales Service: Free on-Site Design Within 24 Hours
Warranty: 1 Year
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Patents Awarded
The supplier had awarded 4 patents, you can check the Audit Report for more information
Full Customization
The supplier provides full customization services
to see all verified strength labels (23)
  • Dissolved Air Flotation Machine for Grease Trap Waste
  • Dissolved Air Flotation Machine for Grease Trap Waste
  • Dissolved Air Flotation Machine for Grease Trap Waste
  • Dissolved Air Flotation Machine for Grease Trap Waste
  • Dissolved Air Flotation Machine for Grease Trap Waste
  • Dissolved Air Flotation Machine for Grease Trap Waste
Find Similar Products

Basic Info.

Model NO.
YMRF
Type
Flotation Machine
Method
Physical Treatment
Usage
Industrial
Name
Dissolved Air Flotation
Material
Carbon Steel
Certification
ISO9001
Delivery Time
15 Days After Receving The Deposit
Application
Industrial and Municipal
Color
Customized
Transport Package
Standard Export Packing
Specification
1~100 m3/h
Trademark
YIMEI
Origin
China
HS Code
8421219990
Production Capacity
5000 Sets Per Year

Product Description

Dissolved air flotation machine

Dissolved Air Flotation Machine for Grease Trap WasteDissolved Air Flotation Machine for Grease Trap WasteDissolved Air Flotation Machine for Grease Trap WasteDissolved Air Flotation Machine for Grease Trap WasteDissolved Air Flotation Machine for Grease Trap WasteDissolved Air Flotation Machine for Grease Trap Waste
 

Dissolved air flotation machine (DAF) is manufactured by our factory and mainly used for solid-liquid separation and liquid-liquid separation. Flotation device will produce large amounts of tiny bubbles by dissolved gas and release system in the water, to make the adhesion in the waste water and water close to the density of solid or liquid particles, causing the whole condition of density smaller than water, and depend on the ascend to the surface flotage, so as to achieve the purpose of the liquid-solid separation, liquid-liquid separation.
 

Work Principle:

 The air will be send by air compressor into air tank, then take in air dissolved tank by jet flow device, the air will be force to dissolve into water under 0.35Mpa pressure and forming dissolved air water, then send to air flotation tank. Under the circumstance of sudden release, the air dissolved in water will be dissolve out and form vast microbubble group, which will be fully contact the flocculating suspended matter in sewage, the suspended matter was sent by pump and flocculation after adding medicine, the ascending microbubble group will adsorb in the flocculated suspended matter, made its density reduce and floated to water surface, thus reach the purpose of removing SS and CODcr etc.

Feature:

 1).Dissolved air pump edge bibulous the edge is inspiratory, pump pressurized mix within, gas to liquid efficient dissolving, small bubbles than 30 um.

2).Low voltage operation, the dissolved gas efficiency is as high as 99%, release rate as high as 99%.

3).Tiny bubbles and suspended particles of efficient adsorption, improve the SS remove effect.

4).Dissolved gas water dissolving efficiency 80-100%, than traditional dissolved gas floating high efficiency three times.

5).Pressure-capacity curve smooth, easy to achieve automatic control, easy to operate, easy maintenance, low noise.

Model and parameters:

 

Model Disposal Equipment size (m) dissolved air vessel size With motor power Equipment total weight
capacity (mm)
(m3/h) Length Width Height   (Kw) (Kg)
YMRF-1 1 1 0.8 1 Φ200   h800 1.5 300
YMRF-3 3 1.7 1.2 2 Φ300   h1000 2.2 800
YMRF-5 5 2.5 1.5 2 Φ300   h1500 2.2 1500
YMRF-10 10 4.6 1.7 2 Φ400   h3000 4 3600
YMRF-20 20 5 2 2 Φ400   h3000 4 5400
YMRF-30 30 5.7 2 2.2 Φ500   h3000 5.5 6300
YMRF-40 40 6.3 2.2 2.2 Φ500   h3000 5.5 7500
YMRF-50 50 7.5 2.2 2.2 Φ600   h3000 7.5 9100
YMRF-60 60 8.3 2.2 2.2 Φ600   h3000 7.5 10000
YMRF-80 80 9 2.2 2.5 Φ800   h3000 11 11500
YMRF-100 100 11 2.2 2.5 Φ800   h3000 15 13000
 



 

 

Our Services

 

1.Professional design for you 
According to the actual needs of professionals will be free to design targeted programs and products to ensure efficient complete solution actual demand.
2.Strict product examination
Professional advanced processing equipment and skilled workers, to build an advanced DAF equipment.
3.Professional after sale service
For equipment installation, specialized personnel will provide overseas equipment installation guide, commissioning, operation, maintenance instructions.
4.Technical support
In the process of use, if you encounter any problems, we will always provide technical support for you.

Company Information

 

    Qingdao Yimei environment project Ltd. Found in 1988,located in maxi Chinese affairs harbour base Jiao Nan City.Occupy about 36,000 square metres, 15,000 square metres workshop building, have each kind of processing machine about 130 pcs, as one of Shandong Province environment protection industrial association trustee member unit, now have staff about 300 person, 72 engineers and technicians, mainly engaged in the environment project, environmental protection equipment design and manufacture, water treatment technological development, engnieering construction, technical service and series of products of client customized.

    We have the well experienced engineer, strong specialized production base, advanced manufacturing facilities, and can supply the first-rate product and special field consulting service.

    In the long rang concentrates efforts on environment protection cause investing in construction, complete sets of equipment and project overall contracting.

Certifications

 

FAQ

 1. How to buy your idea products?  A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).

 2. How to pay?  A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.

 3. What is the delivery time?

  A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.

 4. How to pack the products?

  A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

 5. How to keep your equipments from corrosion? 

 A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.

 6. How do you manufacture your equipment ?

  A:Our  machining technology  includes laser/plasma cutting, automatic welding,CNC cutting and bending.

 7. How to install after the equipments arriving destination?  A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier