Inclined Plate Settler IPS Daf Water Treatment Large Air Flotation

Product Details
Customization: Available
After-sales Service: 24 Hours Online Service
Warranty: 1years
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Years of Export Experience
The export experience of the supplier is more than 10 years
Patents Awarded
The supplier had awarded 4 patents, you can check the Audit Report for more information
Full Customization
The supplier provides full customization services
to see all verified strength labels (23)
  • Inclined Plate Settler IPS Daf Water Treatment Large Air Flotation
  • Inclined Plate Settler IPS Daf Water Treatment Large Air Flotation
  • Inclined Plate Settler IPS Daf Water Treatment Large Air Flotation
  • Inclined Plate Settler IPS Daf Water Treatment Large Air Flotation
  • Inclined Plate Settler IPS Daf Water Treatment Large Air Flotation
  • Inclined Plate Settler IPS Daf Water Treatment Large Air Flotation
Find Similar Products

Basic Info.

Model NO.
YMXG
Method
Physical Treatment
Usage
Industrial, Home, Agriculture, Hospital
Name
Dissolved Air Floating Machine Industrial Waste Wa
Certification
ISO9001
Transport Package
Standard Export Packing
Specification
5~50 m3/h
Trademark
YIMEI
Origin
China
HS Code
8421219990
Production Capacity
2000 Sets Per Year

Product Description

 Lamella clarifier

Inclined Plate Settler IPS Daf Water Treatment Large Air FlotationInclined Plate Settler IPS Daf Water Treatment Large Air FlotationInclined Plate Settler IPS Daf Water Treatment Large Air FlotationInclined Plate Settler IPS Daf Water Treatment Large Air FlotationInclined Plate Settler IPS Daf Water Treatment Large Air FlotationInclined Plate Settler IPS Daf Water Treatment Large Air FlotationInclined Plate Settler IPS Daf Water Treatment Large Air FlotationInclined Plate Settler IPS Daf Water Treatment Large Air Flotation
 

Brief introduction

    The lamella clarifier also called inclined plate sediment tank.It is kind of high efficient combined type settling tank; set many dense inclined tube packing in sediment area, to make the suspended impurity in water sediment, water rise flow along inclined tube, the separated sludge down to the tank bottom along the inclined tube by gravity, then discharge it in concentration. Such tank can improve sediment efficiency 50~60%, it can improve treatment capacity 3~5 times in the same area. It can design different flow rate inclined plate sediment device according to raw waste water test report, it need dose flocculant usually.

Working process


 

    Inclined plate sediment water purifier is format by install 60° dip angle inclined tube above the sludge suspended layer, to make the suspended solids or floc alum flower by dosing flocculant accumulate into thin sludge later in inclined tube downside superficial area, slide back to sludge suspended layer rely on gravity, then settling in sludge collecting hopper, discharge into sludge tank by sludge pipe for separate treatment or comprehensive utilization. The supernatant fluid gradually rise to water collecting pipe discharge or reuse.

Technical data: 

Model XG-5 XG-10 XG-15 XG-20 XG-25 XG-30 XG-40 XG-50
Treatment capacity (m³/h) 5 10 15 20 25 30 40 50
Size(m) 2.2*2*3.5 2.25*2.25*5 5*2.5*4 6*3*4.5 8*3*4.5 8*3.5*4.5 10*3.5*4.5 12*3.5*4.5

Advantages:

1),simple structure,without wearing parts,wear well,decrease maintenance

2),steady operation,easy operation

3),small power,save energy

4),small occupy area, low investment, high efficient

5),short retention time, high sediment efficiency, no sludge backflow.

Application:

1. electroplate effluent contain many kinds of metal ion, cr,cu,Fe,Zn ,Ni etc remove rate all above 90%, after treatment, all can reach discharge standard.

2. coal mine,mineral processing waste water all can make the turbidity from 500-1500 mg/L reduce to 5 mg/L.

3. printing and dyeing,bleach and dye etc effluent chroma removing rate reach 70~90%,COD remove rate 50-70%.

4. Tannery ,food etc industrial sewage COD remove rate 50~80%, impurity solids remove rate above 90%.

5. chemical waste water COD remove rate 60~70%, chroma removal rate 60~90%, suspended solids reach discharge standard.

 

 


Packaging & Shipping

products for the Norwegian customer
Our Services

 

1.Professional design for you 
According to the actual needs of professionals will be free to design targeted programs and products to ensure efficient complete solution actual demand.
2.Strict product examination
Professional advanced processing equipment and skilled workers, to build an advanced DAF equipment.
3.Professional after sale service
For equipment installation, specialized personnel will provide overseas equipment installation guide, commissioning, operation, maintenance instructions.
4.Technical support
In the process of use, if you encounter any problems, we will always provide technical support for you.

Company Information

 

    Qingdao Yimei environment project Ltd. Found in 1988,located in maxi Chinese affairs harbour base Jiao Nan City.Occupy about 36,000 square metres, 15,000 square metres workshop building, have each kind of processing machine about 130 pcs, as one of Shandong Province environment protection industrial association trustee member unit, now have staff about 300 person, 72 engineers and technicians, mainly engaged in the environment project, environmental protection equipment design and manufacture, water treatment technological development, engnieering construction, technical service and series of products of client customized.

    We have the well experienced engineer, strong specialized production base, advanced manufacturing facilities, and can supply the first-rate product and special field consulting service.

    In the long rang concentrates efforts on environment protection cause investing in construction, complete sets of equipment and project overall contracting.

Certifications

 

FAQ

 1. How to buy your idea products?  A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).

 2. How to pay?  A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.

 3. What is the delivery time?

  A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.

 4. How to pack the products?

  A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.

 5. How to keep your equipments from corrosion? 

 A: We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.

 6. How do you manufacture your equipment ?

  A:Our  machining technology  includes laser/plasma cutting, automatic welding,CNC cutting and bending.

 7. How to install after the equipments arriving destination?  A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier